Production Markets
Spain / Portugal
Core Suppliers
4
Category Coverage
4 Verticals
Lead Time Range
5–10 Weeks
Operating Advantage
European production network mapped by category, risk and execution timing.
Supplier structure is not treated as a back-office detail. It is part of JUrtubey’s operating discipline: category specialization, lead-time visibility and controlled production exposure.
Tailoring
Davion
Coimbra, Portugal
Core tailoring production partner.
Strength
Structured garments, linen tailoring, refined construction.
Risk
Higher complexity and longer lead times.
Mitigation
Early sampling, locked production calendar and limited SKU depth.
Denim
12oz Jeans Factory
Portugal
Denim production and wash development partner.
Strength
Denim specialization, wash capability and fit iteration.
Risk
Wash approvals can delay production.
Mitigation
Approve wash standards before bulk production.
Knitwear / Jersey
Oasis Lifestyle
Portugal
Knitwear and jersey production partner.
Strength
Knit development, jersey basics and soft product categories.
Risk
Knitwear costs can pressure margin.
Mitigation
Limit quantities and position as higher-value product.
Shirting
Fase A
Spain
Spanish shirting and lightweight garment partner.
Strength
Closer geography, faster coordination and shirt finishing.
Risk
Capacity constraints during peak season.
Mitigation
Confirm slots early and prioritize core shirts.
Production Timeline
Execution rhythm from design lock to stock arrival.
Design Lock
Timing
T-14 weeks
Final product specifications, colors and construction details approved.
Sampling
Timing
T-12 weeks
Supplier samples, fit review and construction validation.
Costing
Timing
T-10 weeks
Retail price, unit cost, margin and MOQ confirmed.
Bulk Production
Timing
T-8 weeks
Manufacturing begins after approval and deposit.
QC / Delivery
Timing
T-2 weeks
Quality control, logistics and stock arrival before launch.
Risk Matrix
Production risks are identified before scale.
Single supplier dependency
Category production is distributed across Spain and Portugal.
Inventory overexposure
Capsule validation, phased production and controlled SKU depth.
Production delays
Calendar connects stock deadlines with launch windows.
Margin pressure
Retail pricing, supplier cost tracking and sell-through controls.
Relevance